Saturday, April 26, 2025

Remodel At D+52, Pressing Towards The Finish

In keeping with our skiing motif from the last few posts (odd as I've never skied in my life!), we are making our way down the last part of the race. We have our weight over our skis, putting all our momentum forward and increasing our speed to the max. You can hear the crowd cheering and ringing their cow bells.

The vast majority of the painting and flooring is complete (with some minor final touch-ups required), Starting the middle of last week and into next week they are putting in all of the plumbing fixtures, hardware, mirrors, lighting, etc. We keep hitting hiccups like finding one of the two toilets was broken upon opening its packaging. We've even set a date for our movers to come back to put the house together (May 4).

Given how nothing actually happens as it was planned, we will see how it all rolls out.

One Semi-Functional Bathroom


One Bathroom in Need of a Toilet


2 comments:

alexis said...

we have a request for a video of just the toilet flush on a continuous loop

Renee Michelle Goertzen said...

Running water is a beautiful thing that we should all, always, appreciate.