Things are picking up pace. The bathroom tile person finished days earlier than expected. This allowed our GC to get the vanity cabinets installed and the vanity countertops measured. We're hoping to get them installed next week. He also had a carpenter do work on closet shelves Wife had designed. The flooring people will be starting on Monday. They expect to take the whole week.
Wife and I have rented a place since there seems no way we can be in the house given the need for the hardwood part to set before one walks on it. Given the way our house is laid out, there is no way we can get from the upstairs where we currently reside to our kitchen or our garage without going over the new surface. We talked about bringing dried rations to last us for three days and just staying upstairs but ultimately decided that cheap though we may be, that was a bit too much.
Talk About Gifts That Stand The Test Of Time
Made a soup for lunch using the Somen Noodles gifted to us when the #2 clan camped out in ABQ during an early Covid evacuation from (Ukraine?). As Wife is not an Asian food fan (she tolerates my making it - I love it), and I don't think somen is my favorite noodle, it takes a while to get through 3 pounds. But I think we are about 75% of the way done. Maybe I can make some for 2.2 when she visits us to check out NM schools in a couple of weeks?
2 comments:
I used to love noodles but I am more of a broth gal now. So glad they were able to get some of the cabinets done!
That's real progress. I've never heard of any part of a construction project getting done early!