The level of activity was very high this week.

The microwave and cabinet over the cook top and stove were removed


Insulation was put in


They put the first stucco layer on the raised front wall
(Kind of wish I had put turrets on the two posts to complete the fortress look)
(Actually they put one more row of blocks on than I thought they were)
(But a drawbridge might complete the look)


The lath is all on the outside in preparation for the stuccoing of the main structure


The wall to our neighbors has been finished - nice and square and true


Out have come the kitchen window


And the old sliding glass door from the kitchen outside