Wednesday morning is D-Day for the remodel to begin with the demolition of our current two primary bathrooms. Wife and I have been busy emptying everything out of the bathrooms and the master bedroom. It has been lugging a lot of stuff around which has been tiring and tough on our aching backs.
Figuring where to store everything so it is covered in dust that is inevitable from any kind of remodel project (this being our third!) has been a challenge. I will be taking a huge load of stuff to Goodwill today. We have junk removal people getting rid of our antique, barely working exercise equipment tomorrow.
Based on advice from #3, we have decided to NOT include the full house painting as part of this project. Wife was going nuts trying to figure out the colors with only a few small samples of the new flooring. #3 advised we live in the house for a while to get an idea of the best colors. So there will be another project that will essentially be an interior design project with painting, throw rugs for the hardwood floors, revamping of furniture and rooms that will come after this.
Wife, who has been our purchasing agent and has saved us big bucks in the process, still has some last minute plumbing things to buy. We are going to a rental for two days during the demolition process.
Finally happening.
1 comment:
Good luck! I can't wait to see the before and after photos.
Post a Comment