The tile work is moving along at its own pace. We've been told by our GC and the Flooring people that the specific installer assigned to us is a real quality guy. He goes slow but he does things right. We met with both the GC and the Flooring people and finally got our battle plan in order. While we had quite a bit of time to begin with, we now have 2.2 visiting us to look at schools here (an longer story I will write about later). So having a house where we can actually put her up would be desirable.
Next week they will finish the bathroom tiling. Then on April 7 doing all the floors will start. We decided the only way we could expedite the floor work was for us to move out of the house again. So we'll be gone for 5 days. Then on the 14th they will start the painting, which hopefully can get done in a week. Now sometime in all this, the new bathroom vanity, toilets, shower fixtures, mirrors, & lighting all have to be installed. It's going to be interesting to see if this can get done in time for 2.2's arrival on April 22.
And here is the week of work in pictures
2 comments:
That is an impressive timetable if you can all pull it off!
it's looking a lot more bathroom-y!
Post a Comment